EU Green Capital Valencia will host 2024 edition of European Urban Resilience Forum
Crucial aspects of resilience, sustainable development and recovery will be under the thematic spotlight
The new railway line will also extend to Vigo, in Spain, to create an Iberian network
Earlier today, Portuguese Prime Minister Antonio Costa presented the project for a new high-speed railway line which will connect the country’s main cities of Lisbon and Porto and even extend northward to the Spanish city of Vigo. The new line will be completed sometime after 2030 and when ready it will cut travelling time between Porto and Lisbon down to only 1 hour and 15 minutes.
The new line will mean the construction of a separate railway track rather than relying on older infrastructure, which is already deemed to be operating at top capacity as it is. The promoted service will include no stops between Lisbon and Porto.
Portugal already counts with a high-speed train service, called Alfa Pendular, which crosses the whole country from Faro, in the south, to Braga in the North. The problem is that almost half of all passenger trains and more than 90% of freight trains running daily in the country run at least a part of the Northern line.
For this reason, and despite the demand, it is not possible to increase the frequency of rail service on the axis between Porto and Lisbon. What’s more, due to the exhausted capacity of the line, the speed cannot be increased either. Currently, in the best-case scenario, the travel time on the Northern route takes 2 hours and 49 minutes.
That is why the authorities decided that the best move going forward is to initiate the construction of a brand new line. For this purpose, a planned investment of almost 5 billion euros until 2030 has been set aside.
It will take some patience, though. The officials explained that the new high-speed connection will be built in three phases. The first one, between Porto and Soure will be ready in 2028, and the second between Soure and Carregado will be done by 2030. For the last (and shortest) section to Lisbon, however, details are scarce and it was mentioned that it “should only be built later”.
The traditional railway stations in Lisbon and Porto will also be used for this new line, however, in the city of Vila Nova de Gaia, a new station will be built.
The trains will develop speeds of 300 km/h and the line itself is envisioned as being extended eventually to connect with the Spanish high-speed network in the Galician city of Vigo in order to create an integrated network along the entire Atlantic corridor of the Iberian Peninsula.
The city was concerned about street noise and disturbances to residents
This, however, is likely to change soon
Crucial aspects of resilience, sustainable development and recovery will be under the thematic spotlight
Researchers are testing ways to remove "forever chemicals" from the environment and replace them in some commercial goods.
This is city twinning for the 21st century
You can find it in the capital Sofia, where it was installed upon the initiative of the Bulgarian Academy of Sciences
The city was concerned about street noise and disturbances to residents
And the current administration plans to make Jardin del Turia Europe’s largest city green space by extending it to the sea
The aim is to have the public be able to admire the architectural design without distractions
The installation has been thought out with the concept of letting people “talk” to their dearly departed
It’s an urban space that has undergone several large-scale transformations throughout its existence
A US geologist claims to have solved the centuries-old mystery
Urban dwellers across the EU are having a say in making their surroundings friendlier to people and the environment.
Forests in the EU can help green the European construction industry and bolster a continent-wide push for architectural improvements.
Apply by 10 November and do your part for the transformation of European public spaces
Catch up with some recommendations for the 2024 European Capital of Culture programme from the mayor of Tartu
An interview with the ICLEI regional director for Europe аfter the close of COP28
An interview with a member of the No Hate Speech Network team